Neyland Yacht Club Extension

ITH was engaged to carry out the groundworks and an external works package. The scope of the works included:

  • Diversion of existing services (water and electricity).
  • Construction of reinforced concrete foundation and column pads.
  • Block work cavity construction to ground level and install block and beam flooring.
  • Cavity wall superstructure and first-floor block and beam flooring.
  • Foul water services both internal and external, with connection to the main drainage system.
  • Installation of service ducts, electric cables and water main.
  • Demolition of internal partitions and floors.
  • Construction of internal block partitions.
  • Completion of external work block paving and retaining wall.